CPC31220 Certificate III in Wall and Ceiling Lining
Course Code: CPC31220 | CRICOS Code: 113312M
Course Duration: 50 weeks, including 41 study weeks and 9 weeks of holidays.
Course Description
Achieve your dreams in the construction industry with the nationally recognised Certificate III inWall and Ceiling Lining. Become a skilled fibrous plasterer or wall and ceiling liner, and unlock career opportunities. Get hands-on experience in renovations, extensions, and creative projects,and even apply for your contractor licence.
Career Opportunities:
- Fibrous plasterer
- Wall and ceiling liner
- Drywaller
- Site supervisor
ENTRY REQUIREMENTS
- Be aged 18 years or over
- Hold a minimum Higher School Certificate (or equivalent)
- Have a IELTS score of 6.0 with no band less than 5.5 or equivalent tests (within 2 years)
- Satisfactorily completed our Language Literacy Numeracy assessment, or enrolment interview prior to acceptance
Study load:20 hours per week, consisting of 20 hours face to face which include Classroom session, Practical Training, and Supervised Formative Activities.
The prerequisite unit CPCWHS1001 Prepare to work safely in the construction industry (White card) should be presented by the student at the time of enrolment or at the maximum by Week 3 of Term 1.
Student must have access to working PC or laptop with a configuration suitable to meet study requirements.
Student must have access to working internet.
Student must be able to attend scheduled theory classes and classes to be conducted in simulated environment face to face only.
Units of Competency
- CPCCCA3014 Construct and install bulkheads
- CPCCCA3026 Assemble partitions
- CPCCOM2001 Read and interpret plans and specifications
- CPCCCM2012 Work safely at heights
- CPCCOM1012 Work effectively and sustainably in the construction industry
- CPCCOM1013 Plan and organise work
- CPCCOM1014 Conduct workplace communication
- CPCCOM1015 Carry out measurements and calculations
- CPCCPB3001 Fix standard plasterboard wall sheets
- CPCCPB3002 Fix standard plasterboard ceiling sheets
- CPCCPB3003 Fix battens
- CPCCPB3004 Fix wet area sheets
- CPCCPB3005 Fix ceiling sheets to external protected areas
- CPCCPB3006 Fix fibre cement board
- CPCCPB3007 Apply levels of finish standards to planning and inspection of own work
- CPCCPB3008 Mix plastering compounds
- CPCCPB3009 Finish plasterboard joints manually
- CPCCPB3010 Manually sand plaster work
- CPCCPB3012 Cut and fix paper-faced cornices
- CPCCWC3003 Install dry wall passive fire-rated systems
- CPCCWC3004 Install suspended ceilings
- CPCCWHS2001 Apply WHS requirements, policies and procedures in the construction industry
- CPCCPB3018 Use vacuum and electric sanding equipment to finish plaster work
- BSBESB407 Manage finances for new business ventures
- CPCCCM2006 Apply basic levelling procedures
- CPCCCM2007 Use explosive power tools
- CPCCCM2008 Erect and dismantle restricted height scaffolding
- CPCCPB3017 Rectify faults in drywall applications
- CPCCWC2001 Complete penetrations and flashings
