CPC31220 Certificate III in Wall and Ceiling Lining
Course Code: CPC31220 | CRICOS Code: 113312M
Course Duration: 104 weeks
Course Description
Achieve your dreams in the construction industry with the nationally recognised Certificate III inWall and Ceiling Lining. Become a skilled fibrous plasterer or wall and ceiling liner, and unlock career opportunities. Get hands-on experience in renovations, extensions, and creative projects,and even apply for your contractor licence.
Career Opportunities:
- Fibrous plasterer
- Wall and ceiling liner
- Drywaller
- Site supervisor
ENTRY REQUIREMENTS
- Be aged 18 years or over
- Hold a minimum Higher School Certificate (or equivalent)
- Have a IELTS score of 6.0 with no band less than 5.0 or equivalent tests (within 2 years)
- Satisfactorily completed our Language Literacy Numeracy assessment, or enrolment interview prior to acceptance
Units of Competency
- CPCCCA3014 Construct and install bulkheads
- CPCCCA3026 Assemble partitions
- CPCCOM2001 Read and interpret plans and specifications
- CPCCCM2012 Work safely at heights
- CPCCOM1012 Work effectively and sustainably in the construction industry
- CPCCOM1013 Plan and organise work
- CPCCOM1014 Conduct workplace communication
- CPCCOM1015 Carry out measurements and calculations
- CPCCPB3001 Fix standard plasterboard wall sheets
- CPCCPB3002 Fix standard plasterboard ceiling sheets
- CPCCPB3003 Fix battens
- CPCCPB3004 Fix wet area sheets
- CPCCPB3005 Fix ceiling sheets to external protected areas
- CPCCPB3006 Fix fibre cement board
- CPCCPB3007 Apply levels of finish standards to planning and inspection of own work
- CPCCPB3008 Mix plastering compounds
- CPCCPB3009 Finish plasterboard joints manually
- CPCCPB3010 Manually sand plaster work
- CPCCPB3012 Cut and fix paper-faced cornices
- CPCCWC3003 Install dry wall passive fire-rated systems
- CPCCWC3004 Install suspended ceilings
- CPCCWHS2001 Apply WHS requirements, policies and procedures in the construction industry
- CPCCPB3018 Use vacuum and electric sanding equipment to finish plaster work
- BSBESB407 Manage finances for new business ventures
- CPCCCM2006 Apply basic levelling procedures
- CPCCCM2007 Use explosive power tools
- CPCCCM2008 Erect and dismantle restricted height scaffolding
- CPCCPB3017 Rectify faults in drywall applications
- CPCCWC2001 Complete penetrations and flashings
